Column dictionary

ResourceName

Resource Name · Cost and Usage dataset

Feature level
Conditional
Data type
String
Allows nulls
Yes
Column type
Dimension

What it is

The Resource Name is a display name assigned to a resource. It is commonly used for cost analysis, reporting, and allocation scenarios.

Requirements (6)

Verbatim from the specification. These are the statements the validator checks against.

  • ResourceName MUST be of type String.
  • ResourceName MUST conform to StringHandling requirements.
  • ResourceName MUST adhere to the following nullability requirements:
  • ResourceName MUST be null when ResourceId is null or when the resource does not have an assigned display name.
  • ResourceName MUST NOT be null when ResourceId is not null and the resource has an assigned display name.
  • ResourceName MUST NOT duplicate ResourceId when the resource is not provisioned interactively or only has a system-generated ResourceId.

Check your own export

The FOCUS 1.4 validator checks this column and 122 others against your file, in your browser, with no size cap and nothing uploaded.

Other Cost and Usage columns

Definition taken from the FOCUS 1.4 specification. FOCUS is published by the FinOps Foundation under CC BY 4.0.

One column is a definition. A pipeline is a project.

Finitizer ingests FOCUS from every provider you run and reports across all of them.