| Scopes | Scope 1, 2 and 3. | Scope 1, 2 and 3. | Scope 1, 2 and 3. | Not documented; the figures come from electricity. |
|---|
| What Scope 3 includes | Making IT hardware, buildings and equipment; upstream fuel and energy, including grid losses; upstream transport. | Making equipment and buildings, staff travel and commuting, grid losses and upstream fuel. | Hardware materials, making components, transport and end of life. Data center buildings are not included. | Not documented. |
|---|
| Location-based | Yes, since June 2025. | Yes, from hourly grid figures. | Not shown: the portal reports Scope 2 market-based. | Power-based method only (Compute and Storage). |
|---|
| Market-based | Yes; the console shows it by default. | Yes, since September 2024, with data from January 2023. | Yes. | Yes: the spend-based method (list price times a regional factor) and the power-based one. |
|---|
| Broken down by | Account, Region, service and month. | Billing account, project, service, region and month; AI inference by SKU from January 2026. | Subscription, resource group, resource, resource type, location and month. | Day or month; tenancy, compartment, region, availability domain, service, SKU, resource and tag. |
|---|
| Units | Metric tonnes (MTCO2e), to the gram. | Kilograms (kgCO2e) in the export; tonnes in the console. | Metric tonnes in the methodology; check the header of your export. | Metric tonnes (MTCO2e). |
|---|
| When a month appears | By the 21st of the following month. | The export lands on the 15th of the following month. | The previous month by the 19th. | Not documented. |
|---|
| History | Back to January 2022. | Back to January 2021. | 12 months only, so export every month to keep more. | Not documented. |
|---|
| Hardware and buildings | IT hardware over 6 years, buildings over 50, shared by use. | Equipment over 4 years, buildings over 20, shared by electricity use. | Equipment over 6 years, shared by use; buildings not counted. | Not documented. |
|---|
| Third-party assurance | The methodology is third-party assured. | Not yet assured, Google says; the allocation method was reviewed against the GHG Protocol. | Not documented. | Not documented; Oracle calls every figure an estimate. |
|---|
| Export | CSV, API, and Data Exports to S3 as CSV or Parquet. | BigQuery, through the Data Transfer Service. | CSV, and the carbon emission reports REST API, up to 100 subscriptions a query. | CSV, and the Usage API. |
|---|
| Cost | No extra charge. | No charge stated for the report; BigQuery storage and queries are billed as usual. | Free. | For paying commercial customers; no separate price. |
|---|